top of page

St. Ann's Primary Girls' School Water Tank

The Problem

St. Ann's Primary Girls' School does not have raised water tank. The water is not able to move through the campus water piping system because of the low pressure. The sinks that Mission Madera installed on the campus are unusable.

Mission Madera funding the building of sinks that are unusable because there is no water pressure across the campus.

The Solution

Mission Madera is hiring a Ugandan company to build a water tower high enough to pump water to the whole campus.

Stage 1: Building the Foundation

Contractors surveying the land

Digging out the foundation

Stage 2: Building the Tank Basement

  • Instagram
  • Facebook

​© 2025 by Mission Madera Powered and secured by Wix

bottom of page